Scoping Review: Strategies For Managing Non-Conformities In Implementing Construction Contracts In Timor-Leste.

  • João Quintão do Rêgo Doctoral Program in Engineering Management, National Institute of Technology, Malang, Indonesia
  • Aryuanto Soetedjo Doctoral Program in Engineering Management, National Institute of Technology, Malang, Indonesia
  • Nusa Sebayang Doctoral Program in Engineering Management, National Institute of Technology, Malang, Indonesia
  • Nanta Sigit Doctoral Program in Engineering Management, National Institute of Technology, Malang, Indonesia
Keywords: construction contract, contract nonconformance, project management, management strategies, scoping review, Timor-Leste

Abstract

The construction sector in Timor-Leste plays a vital role in supporting national development and economic growth, primarily through infrastructure projects financed by the government and international donors. However, the implementation of construction contracts in the country frequently encounters various nonconformities, such as delays, technical specification changes, differing interpretations of contract clauses, and cost overruns. These issues reflect weaknesses in contract management systems and the lack of systematic strategies to manage nonconformities during project execution. This study employs a Scoping Review approach to map globally reported strategies for managing construction contract nonconformities and to identify knowledge gaps in developing country contexts, particularly Timor-Leste. The review process follows the PRISMA-ScR guideline, encompassing literature searches in Scopus, ScienceDirect, Taylor & Francis, and Google Scholar databases covering publications from 2000 to 2025. The findings reveal that management strategies for contract nonconformities can be categorized into three main groups: preventive strategies (risk prevention through clear contract design and early communication), resolutive strategies (dispute handling via claims, mediation, and dispute boards), and adaptive strategies (contract flexibility and collaborative approaches). The study highlights the importance of adapting global best practices to the local context of Timor-Leste, taking into account institutional capacity, contractual regulations, and human resource competence. The findings are expected to serve as a foundation for developing more effective contract management policies and practices within Timor-Leste’s construction sector.

References

Amoah, C., & Hlatshwayo, N. (2022). Effective management strategies for construction contract disputes. International Journal of Building Pathology and Adaptation. https://www.researchgate.net/publication/362503179_Effective_management_strategies_for_construction_contract_disputes
Arksey, H., & O’Malley, L. (2005). Scoping studies: Towards a methodological framework. International Journal of Social Research Methodology, 8(1), 19–32. https://doi.org/10.1080/1364557032000119616
Joanna Briggs Institute. (2020). JBI manual for evidence synthesis: Chapter 11 – Scoping reviews. Adelaide: JBI. https://jbi-global-wiki.refined.site/space/MANUAL
Tatoli. (2024, July 30). January–July 2024: Only 20% of infrastructure budget utilized. Tatoli News. https://id.tatoli.tl/2024/07/30/januari-juli-2024-penggunaan-dana-infrastruktur-baru-mencapai-20
Tatoli. (2024, October 25). Timor-Leste government targets 4.1% GDP growth in 2025. Tatoli News. https://id.tatoli.tl/2024/10/25/pemerintah-timor-leste-targetkan-pdb-capai-41-pada-2025
Tatoli. (2025, February 7). CNA reports increased project procurement contracts in 2024. Tatoli News. https://id.tatoli.tl/2025/02/07/cna-laporkan-jumlah-kontrak-pengadaan-proyek-meningkat-pada-tahun-2024
Tricco, A. C., Lillie, E., Zarin, W., O’Brien, K. K., Colquhoun, H., Levac, D., Moher, D., Peters, M. D. J., Horsley, T., Weeks, L., Hempel, S., Akl, E. A., Chang, C., McGowan, J., Stewart, L., Hartling, L., Aldcroft, A., Wilson, M. G., Garritty, C., … Straus, S. E. (2018). PRISMA Extension for Scoping Reviews (PRISMA-ScR): Checklist and explanation. Annals of Internal Medicine, 169(7), 467–473. https://doi.org/10.7326/M18-0850
Investigating the effectiveness of contract administration in minimizing disputes. (2025). Journal of Construction Management and Engineering. Taylor & Francis. https://www.tandfonline.com/doi/full/10.1080/13467581.2025.2467249
Structured literature review on construction conflict prevention and dispute management. (2022). Organization, Technology and Management in Construction: An International Journal, 14(1), 2251–2264. https://reference-global.com/2/v2/download/article/10.2478/otmcj-2022-0006.pdf
Factors of conflict in construction industry: A literature review. (2011). Procedia Engineering, 20, 193–202. https://www.researchgate.net/publication/271608287_Factors_of_Conflict_in_Construction_Industry_A_Literature_Review
World Bank. (2023). Timor-Leste economic report: Sustaining recovery, maintaining stability. Washington, DC: World Bank. https://documents.worldbank.org
Asian Development Bank. (2024). Infrastructure sector assessment for Timor-Leste. Manila: ADB. https://www.adb.org
Published
2025-12-25
How to Cite
João Quintão do Rêgo, Aryuanto Soetedjo, Nusa Sebayang, & Nanta Sigit. (2025). Scoping Review: Strategies For Managing Non-Conformities In Implementing Construction Contracts In Timor-Leste. International Journal of Business and Quality Research, 3(04), 426-433. https://doi.org/10.63922/ijbqr.v3i04.2733