Analysis Of The Effect Of The New Advance Payment Amount On The Efficiency Of Construction Work Implementation
Abstract
This research aims to analyze the influence of the down payment on the efficiency of carrying out construction work on projects managed by the Public Works and Public Housing Service (PUPR) of East Seram Regency. Down payments in construction contracts are an important factor that influences the smooth running of the project, especially in terms of time efficiency, costs and quality of work. The research method used is a quantitative approach using surveys and interviews with contractors, project supervisors and related officials. The research results show that a higher down payment can speed up project implementation in terms of time, but does not always have a positive impact on cost efficiency and work quality. Cost overruns and a decrease in quality often occur if the management of down payment funds is not properly supervised. This research provides recommendations to the PUPR Department of East Seram Regency to establish a down payment policy that is more efficient and in accordance with the characteristics of each project, as well as increasing supervision over the use of down payment funds to minimize waste and maintain the quality of construction results.
References
Sutedi, Adrian. 2008. Hukum Pengadaan Barang dan Jasa. Jakarta: Sinar Grafika.
Weele, A. J. van. 2010. Purchasing and Supply Chain Management: Analysis, Strategy, Planning and Practice. 5th ed. London: Cengage Learning.
Peraturan Pemerintah Nomor 7 tahun 2021 tentang Kemudahan, Pelindungan, dan Pemberdayaan Koperasi dan Usaha Mikro, Kecil, dan Menengah.
Peraturan Presiden Nomor 12 Tahun 2021 tentang Perubahan atas Peraturan Presiden Nomor 16 Tahun 2018 tentang Pengadaan Barang/Jasa Pemerintah.
Peraturan Presiden Nomor 16 Tahun 2018 tentang Pengadaan Barang/Jasa Pemerintah tentang Pengadaan Barang/Jasa Pemerintah.
Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah (LKPP), Peraturan LKPP Nomor 12 Tahun 2021 tentang Pedoman Pelaksanaan Pengadaan Barang/Jasa Pemerintah Melalui Penyedia, Jakarta, Indonesia: LKPP, 2021. Diakses pada 9 Maret 2025. [Daring]. Tersedia: https://jdih.lkpp.go.id.
Kementerian Keuangan Republik Indonesia, Peraturan Menteri Keuangan Nomor 25 Tahun 2024 tentang Pengelolaan Dana Alokasi Khusus Fisik, Jakarta, Indonesia: Kementerian Keuangan, 2024. Diakses pada 9 Maret 2025. [Daring]. Tersedia: https://jdih.kemenkeu.go.id.
Regisnati, U. (2018) ‘Tinjauan Pengadaan Barang/Jasa Pemerintah Melalui Sistem Pengadaan Barang/Jasa Elektronik’, Jurnal Pengadaan, 1(2), pp. 25–35.
Srijani, Ninik. (2020). Peran UMKM (Usaha Mikro Kecil Menengah) Dalam Meningkatkan Kesejahteraan Masyarakat. EQUILIBRIUM : Jurnal Ilmiah Ekonomi dan Pembelajarannya. 8. 191. 10.25273/ equilibrium.v8i2.7118.
Regisnati, U. (2018) ‘Tinjauan Pengadaan Barang/Jasa Pemerintah Melalui Sistem Pengadaan Barang/Jasa Elektronik’, Jurnal Pengadaan, 1(2), pp. 25–35.
Zulmawan, W. (2023) ‘Efektivitas Aturan Penggunaan Produk dalam Negeri pada Pengadaan Barang/Jasa Pemerintah’, Unes Law Review, 6(1), pp. 2152 2167. doi:10.31933/unesrev.v6i1.





.png)















Contact Person +6282139474255
Email : ijebir@citakonsultindo.or.id / editor.ijebir@gmail.com